Scope of Project: Wine Cellar, Entertainment Room, Exercise Timeline: 4 Months
We asked CB Geesaman to increase our living space inside and outside. They started with the entrance drive to our property and added a spacious deck and patio area, a beautiful “wine cellar”, an entertainment room, an exercise room, an additional bath and a much needed tool shed.
Scope of Project: Sunroom Addition Timeline: 3 Months
The sunroom was enlarged and transformed into a family room but the finished product looks like it was there from the beginning. Take note of the rounded addition, the built-in grill, the interior molding and the beautiful flooring. The flow from the new space to the existing kitchen area adds the charm of a “greatroom” for cozy family gatherings or for entertaining numerous guests. The owners highly recommend C.B. Geesaman Builders to anyone looking for “specialty” construction.
Scope of Project: Commercial Renovation Timeline: 6 Months
Totally remodeled schoolhouse into animal hospital. As you roam through this modern animal hospital, remember that it started as an old 4-room schoolhouse, which was totally gutted. Take note of the blackboards, the book shelves, the ceiling lights, the waiting room benches, etc. Rather than a clash of eras, Carlton B Geesaman team brought them together in a very attractive and pleasant atmosphere. Many of the original features of the schoolhouse were refurbished to fit right in with the state-of-the-art technology of medical science. Details are always important – note the doghouse floor motif which points the way to an emergency exit.