• New Construction

    New Construction

  • Excavtion

    Excavation

  • Remodeling

    Additions

  • Carlton B. Geesaman, Inc
  • Remodeling

    Remodeling

Posts Tagged ‘New Construction’

New Construction

Project 2

Scope of Project: New Construction
Timeline: 6 Months

Green building at its finest! Featuring the latest green technologies in insulation, interior paints and flooring. Solar power system for electrical power and heating system. Rain water collection system for gardening water.

Continue Reading No Comments

New Construction

Project 1

Scope of Project: New Construction
Timeline: 12 Months

4,300 sq ft home featuring stone and stucco exterior with brick trim and window surround. 2 X 6 wall framing with 7/16” OSB Sheathing. Roof engineered truss system with 5/8” T&G OSB Sheathing. Insulation consists of R21 Wall with Super Seal package, floor has R–21 insulation, R-38 in ceilings. Windows are Andersen 400 Series with Jeldwen exterior doors.

Continue Reading No Comments

New Construction

Project 4

Scope of Project: New Construction
Timeline: 12 Months

This 5,400 Sq. ft., 4 to 5 bedroom, new construction home in the rolling hills of Hummelstown, PA showcases the exceptional craftsmanship that CB Geesaman is known for. The attention to detail is apparent when you first walk up to the exquisite 4’ x 9’ custom front door made of Honduran mahogany and the custom built Honduran mahogany porch railing with Philippine mahogany tongue & groove ceiling. The exterior is surfaced with 100% masonry stone.

Continue Reading No Comments

Carlton B. Geesaman, Inc.

  • 10303 Mountain Rd | Grantville, PA 17028
  • info@cbgeesaman.com
  • (717) 865-4216
  • (717) 865-4211
  • Follow Us on
© 2024 Carlton B. Geesaman, Inc. | All Rights Reserved | Designed & Developed by STRYV Creative